Cost Allocate FFP:Mmis 5050 Cost Allocate FFP Story

Build 1103 on tbolt/4506-proposed-budget-executive-summary-updates
1200px
Reviewing disabled
The baseline is taller than the new snapshot (1168x1335 to 1168x1313).
Baseline History
Build 110379fe380
Current build. There are unaccepted changes, so build 1056 is still the baseline.
Build 1048f96dd44
Accepted by Tiffany.
Commenting is disabled because there's a newer build on this branch